Part of the AAR ESS Group · Sports infrastructure since 1998

Region: UAE ▾
WhatsApp us
GOSPORTZ AXIS Contact

Tennis courts in GreenSet acrylic

GreenSet, Tennis Australia’s official surface since 2020, on new bases or existing hard courts.

Tournament tennis court with seating, Mumbai
Cricket Club of India, Mumbai. GoSportz installation.
ITF pace categories
5, from Slow to Fast
Recoat interval
Typically 4 to 8 years
Base
Asphalt or concrete

01How the surface is built

Thin acrylic coats on a bound base. Cushioned systems add rubber-filled coats for comfort.

  1. 01 Base Asphalt or concrete, repaired and level.
  2. 02 Acrylic resurfacer Levels the base. Top Flooring
  3. 03 Cushioned systems only Cushion coats More coats, more give. Top Flooring · Plexicushion
  4. 04 Colour coats Sand content sets the pace.
  5. 05 Lines Court markings set out for the chosen sport.

02Choosing a pace

ITF pace categories
5
ITF
CPR, Slow category
≤ 29
ITF
CPR, Fast category
45+
ITF
Tennis Australia supplier from
2020
Tennis Australia
Full specification
ITF Court Pace Rating categories
1 · SlowCPR 29 or less
2 · Medium-slowCPR 30 to 34
3 · MediumCPR 35 to 39
4 · Medium-fastCPR 40 to 44
5 · FastCPR 45 or more
Source: ITF surface assessment
GreenSet
Based inBarcelona
OwnerJavier Sánchez Vicario, since 2000
Tennis AustraliaOfficial supplier from 2020
ITF paceMedium-slow to Medium-fast*
OlympicsRio 2016*
Source: Tennis Australia, 2019; *Wikipedia (secondary)
Partner reference · GreenSetTournament courts from the surface manufacturer’s reference deck: Davis Cup, Cincinnati Open, Rio 2016

03Resurfacing an existing court

On a sound base, a recoat beats a rebuild. We survey for cracks first.

GoSportz in India resurfaced 3 main and 4 practice courts for the Tata Open Maharashtra (ATP 250), Pune, 2022.

GreenSet brand profile →

04Questions we get asked

How often does a hard court need recoating?

Every 4 to 8 years.

Cushioned or standard acrylic?

Cushioned is easier on joints and costs more.

Which pace category should we choose?

It depends on who plays. We show you the ITF listing first.

Can you resurface a court built by someone else?

Yes, once the base is checked and repaired.

Tennis in pictures

GoSportz tennis projects and tournament courts in India.

05Recent installations in India

All projects

Book a court survey

Tell us court count, new or existing, and who plays.

Book a court survey
WhatsApp
+971 54 429 4566
Email
contact@gosportzaxis.me
Phone
+971 6 749 1459
Office
Q3-195, Sharjah Airport International Free Zone (SAIF), Sharjah, UAE
Response
Within 24 hours; quotes within 48 hours